Simon was featured in the Southern Gateway Summer 2018 Project Newsletter. The Southern Gateway project is a $666M TxDOT Design-Build project led by Pegasus Link Constructors.  The project consists of widening and rebuilding IH 35E south of downtown to US 67 and widen US 67 between IH 35 E and IH 20. Pegasus contracted Simon to design the relocation and replacement of various water and wastewater utilities within the project limits.